14Feb24 Letter Regarding Approval to Bypass 60% RD and Advance to 95% RD – ISS within HB 1 216 downloads
|
Holding Basin, In-Situ Sequestration
|
September 5, 2024
|
Download
|
10Apr24 Tech Memo Regarding Wells Proposed for Decomissioning 1 182 downloads
|
Holding Basin
|
September 5, 2024
|
Download
|
18Jun24 Letter Regarding Change for Submittal Date for Intermediate 60% RD Report for Holding Basin Containment Wall and Cap 1 153 downloads
|
Holding Basin
|
September 5, 2024
|
Download
|
18June24 Letter Regarding Approval of Request to Change for Submittal Date for Intermediate 60% Design Report for Holding Basin Containment Wall and Cap 1 150 downloads
|
Holding Basin
|
September 5, 2024
|
Download
|
Holding Basin Pre-Design Investigation Report Final 13OCT22 1 1731 downloads
|
Holding Basin
|
March 22, 2023
|
Download
|
NMI Final RDWP Implementation Plans 1 3040 downloads
|
Bedrock Groundwater, Holding Basin, Remedial Design Work Plans, Sitewide Soils and Sediments
|
November 6, 2020
|
Download
|
NMI Final RDWP Appendix C PDI-WP Holding Basin Containment 1 2242 downloads
|
Holding Basin, Remedial Design Work Plans
|
November 6, 2020
|
Download
|