01Feb24 95 RD for ISS of Uranium In Overburden Within HB 1 179 downloads
|
In-Situ Sequestration
|
September 5, 2024
|
Download
|
14Feb24 Letter Regarding Approval to Bypass 60% RD and Advance to 95% RD – ISS within HB 1 216 downloads
|
Holding Basin, In-Situ Sequestration
|
September 5, 2024
|
Download
|
23Apr24 Letter Requesting 6-Month Extension for Submittal of 100% RD for In-Situ Squestration of Uranium in Overburden Within the Holding Basin 1 225 downloads
|
In-Situ Sequestration
|
September 5, 2024
|
Download
|
24Apr24 Letter Regarding to Change Submission Date of 100% RD Report for In-Situ Sequestration of Uranium in Overburden Within Holding Basin 1 194 downloads
|
In-Situ Sequestration
|
September 5, 2024
|
Download
|
NMI RDWP Response to Comments Appendix E In-Situ Sequestration 25SEP20 1 2562 downloads
|
In-Situ Sequestration, Remedial Design Work Plans
|
November 6, 2020
|
Download
|
NMI Final RDWP Appendix E Treatability Study Plan In-Situ Sequestration 1 2085 downloads
|
In-Situ Sequestration, Remedial Design Work Plans
|
November 6, 2020
|
Download
|
NMI Final RDWP Appendix B Pre-Design Investigation Work Plan In-Situ Sequestration 1 2247 downloads
|
In-Situ Sequestration, Remedial Design Work Plans
|
November 6, 2020
|
Download
|