NMI Final RDWP Appendix D Pre-Design Investigation Work Plan 1,4-Dioxane and VOCs in Bedrock Groundwater | GeoSyntec | September 2020 | March 26, 2020 | September 15, 2020 | Download
| bedrock-groundwater remedial-design-work-plans | pre-design-investigation |
NMI Final RDWP Implementation Plans | Haley Aldrich and Geosyntec | Sept and Aug 2020 | September 18, 2020 | October 1, 2020 | Download
| bedrock-groundwater holding-basin remedial-design-work-plans sitewide-soils-sediments | implementation-plans treatability-study |