Overall RD/RA

The Remedial Design/Remedial Action (RD/RA) work will continue to implement the remedy selected by USEPA, as outlined in the Record of Decision (ROD, September 2015) and Statement of Work (August 2011). Prior to this RD/RA work, the Settling Defendants initiated two Non Time-Critical Removal Actions (NTCRA) for Building Demolition (2011) and Groundwater (2016) which situated the site with temporary liner over the demolished building sites and the permanent Ex-Situ Groundwater Treatment facility in place. 

The five Remedial Components of the RD/RA (Soils & Sediment, ISS, Holding Basin, Ex-Situ Groundwater, and Bedrock Groundwater) will each consist of its own design and construction timeline. Progress will be featured accordingly on each web page.

Site-wide monitoring will be performed and updated as part of the overall project.

View Completed Activities

Latest News

RDWP Documents Approved by EPA

Remedial Design Work Plan Documents, originally submitted to EPA on March 26, 2020, have been approved and work has commenced. The RDWP documents include the Pre-Design Investigation Work Plans and all the Response to EPA Comment documents and are now available for download.

Authorization to Proceed

USEPA issued an Authorization to Proceed on 31DEC19 for de maximis, inc. as the Project Coordinator and Supervising Contractor for the Remedial Design / Remedial Action of the Nuclear Metals, Inc. Superfund Site.